Basement Bathroom Remodel Begins

Welcome to our basement bathroom (currently a construction zone).  We’re really proud of the progress so far as we make some much-needed improvements. Before all of this work, the bathroom had been the pinnacle of 1990s design, with its popcorn ceiling, ceramic sink and builder’s grade ammenities. It also had several bizarre features including deep but narrow shelves, and an unnecessarily small shower with a door that couldn’t fully swing open because there was a toilet in its path.

Like all home improvement projects, I have to wait to grab the hammer until I’ve answered two basic questions:
1. Do we have the money?
2. Do we have the time and energy? 
In this case, we didn’t necessarily have the money but with winter on the horizon I did have plenty of time and energy to spend working on something indoors.  One December afternoon, I made the decision to get to work.

After the satisfying experience of taking a sledge to ceramic, and the more strenuous chore of removing the shower, my next task was to physically move the location of the shower drain pipe. I did this because we wanted the new shower to take up the entire end of the room with the drain centrally located. We believe this was how the house was originally planned, because the foundation had a curious square spot that had been repaired exactly where we wanted the drain.

To move the drain, I used my brother-in-law’s hammer drill to break up the concrete. Then, I cut out the existing PVC pipe and replaced it with new piping. In the slideshow below, you will see a pink string I hung from the ceiling, which I used to make sure the pipe was perfectly centered as I applied PVC cement.

Tearing up all of that concrete made a huge mess and kicked up a lot of dust. This happened because I used my circular saw and a mason sawblade to cut several lines before hammering at them. At some point, my ShopVac stopped working. I found the on/off switch had become clogged with dust particles. The company itself was not helpful in finding a solution. Thankfully, I found a replacement switch online and was able to put it back together and get it working again.

After moving the drain pipe, I figured I should probably replace the busted foundation. I used 4, 60-lb bags of Quikrete to create the new slab of concrete. I intentionally lowered this layer of concrete an inch and a half below the previous foundation, leaving room for me to eventually create a sloped shower pan with zero-barrier entry. After the concrete cured, I put down a layer of insulation and installed the heated floor cabling. I installed a mat system from Warming Systems.

The heated floor now installed, with cabling going up conduit to a thermostat, I poured a layer of self-leveling underlayment. The underlayment does several things: it holds the heating cables in place, it radiates the heat produced by them, and it also creates a flat surface for tiles. I used a few temporary pieces of wood to keep the underlayment from spilling out of the room and into the shower pan.

For the sloped shower pan, I mixed up about 75 lbs of bedding mortar and slowly packed it down to the floor of the shower. I used a level to scrape the floor from the sides to the drain, creating a slope for the water to follow. The drain is from FloFX.

Around this time, I also started putting up paneling in the shower. I had planned to install concrete backerboard, until I was walking in a hardware store one day and came across a lighter-weight option. I had never heard of GoBoard, but looked into it and decided it was worth the extra price. It was very easy to cut and install. Next, I turned my attention to the ceiling fan, which I replaced with a newer unit of similar dimensions:

With much of the electrical work complete, I replaced the drywall I had removed to access the wires.

Taking a pause from masonry, electrical, HVAC and drywall, I got to work on the plumbing for the new shower. We knew we wanted this bathroom to have a “luxury” feel to it, so went with a faucet from Delta that has both a shower head and a handheld sprayer. I used my new workbench in the garage to solder pipes together before putting everything in place.

Happy with the plumbing, I finished installing the GoBoard, applied the recommended Johns Manville sealant to joints, put a waterproof membrane on the floor, then coated everything with RedGard waterproofing. Here’s a video of the first time I tested the shower:

That was a lot of work and there’s still plenty to do! Up next, choosing tiles and installing. Click here to see that blog post.
Thanks for reading!
-Mike

Updated Bathroom Vanity

I’m starting this post with an “after” pic because we are so pleased with the results of this project! It just took WAY longer than we thought to complete (keep reading to find out why). This vanity replaces a very decorative vanity (pictured below), which was purchased by the previous homeowners. Aside from not liking the style of the original we were puzzled by how to use it properly in the space because it didn’t have any drawers. We struggled to find places to put things like toothbrushes and hair brushes, so decided it was an easy first update to this new home of ours.

This update came with several challenges: First, there is a floor vent beneath the vanity, meaning any replacement would need to be free-standing, unless we wanted to re-route the vent. Second, the space is an odd size for the most-popular sizes available at the big box stores (44″ wide would be perfect, but the most common sizes are 36″ 42″ and 48″. With these challenges in mind, we decided to piece something together on our own. We started by finding a vanity bottom that met our needs. We ended up finding exactly what we were looking for and ordered it online from Home Depot:

The vanity is part of the Cambridge collection by Ariel. It’s 42″ wide, 34.5″ tall and 21.5″ deep. We wanted something sturdy, which we got thanks to the hardwood design, and it also came with soft-closing doors and drawers, which was an added perk.

With the vanity bottom in place, we painted the walls and did a little plumbing to replace the rusty supply lines. The walls are now “Mineral” by Behr in a satin finish (we used the color in multiple rooms in our Apple Valley home). The vanity top was a granite remnant found at The Pinske Edge here in Rochester, MN. This is our second granite counter they have made for us from remnants at their business. We love the pattern, as you can tell because we used something nearly identical in a previous project at our first house. Unfortunately, the customization process meant our bathroom sink was out of commission for more than a month. The company needed the new vanity bottom in place and mounted to take accurate measurements, which is understandable. Then, after several weeks of waiting, the granite they brought out for installation had been miss-measured and the sink sat too far forward. We had to pick out another remnant, get another set of measurements taken, then wait another full week to get it installed. In the end, it was worth it, because we ended up changing our mind about the granite color and going with what you see below. We are very happy with The Pinske Edge and would hire them again without hesitation.

The faucet is Moen Lindor brushed nickel. We like the design and this may be the second time we’ve purchased this particular one.

Finally, we updated the mirror, installing a simple builder’s grade 36″x 42″ which we might frame in down the road.

With the new white cabinet, the softer grey/beige color on the walls, the space feels so much brighter and much more “us” – we’re very happy with the results. The next update you can expect to see in this space will be white doors and trim. Thanks for reading!
-Mike