The Upstairs Bathroom Remodel – Part 2 of 2

With the shower tiles in place, the next task was working on the ceiling.  We are not fans of popcorn ceilings and wanted to go with wood panels.  To avoid having to scrape off all of the popcorn, I simply scraped lines and attached wood slats.  I would use those slats as supports for the new ceiling panels.

IMG_2247

Notice, there is also a hole cut for a new ceiling fan in the shower.

The new ceiling fan was not the most fun home improvement project I have ever tackled.  To install it, I had to cut a new hole in the ceiling, climb into the attic, rewire the new fan, move the exhaust pipe and seal it all up afterward.  This was late June and even though Minnesota summers are mild, attics are HOT!  I think I lost 2 pounds in sweat up there (note to self: never install an at-home sauna – just go sit in the attic).  Along with physically moving the fan in the attic, I needed to install a GFCI circuit breaker to meet code, because the fan would be in the shower.

IMG_2253

The housing for the new fan is in place, and ceiling boards are starting to surround it.

I used trim screws to attach the boards to the ceiling, carefully hiding each screw in the notches between boards so they would not be visible later.  After all of the boards were in place, I painted them to cover up any imperfections.

IMG_2268

With the ceiling in place, and the shower tiles finished, it was time to start on the floor.

Now that the shower and ceiling were finished, I turned my attention to the floor.  The first step was to lay down 1/4 inch backer board.  This backer board is the same that I used on the walls, just thinner.  It provides a solid base for the tiles.  If you put tiles on wood floor boards, the tiles could crack.  But concrete backer board does not bend the same way that wood does.  After putting down the backer board, I needed to find a pattern that would work for the tiles themselves.  The picture below shows what the floor tiles would have looked like if I had simply laid them out in a simple grid.  Not very nice.

IMG_2269

The picture below shows the floor tiles after I have made cuts and placed them in a staggered pattern.  The hardest tile to cut was probably the one with the heat vent in the middle of it.  I bought a diamond blade for my angle grinder to help ease this process along.
IMG_2271

With the floor tiles being much larger than the shower tiles (18″ by 6″ as opposed to 3″ by 6″) I used quarter inch spacers between each of the floor tiles, different from the eighth inch spacers used in the shower.  I used the spacers when loosely placing the tiles, but they are not shown in the photo above.  After using mud to secure the tiles in place (the same mud used on the shower tiles), it was time to start grouting.  The grout fills the gaps between each tile.  I used the same pre-mixed grout from the shower.  Delorean gray.  The pre-mixed costs more than the powder, but you never have to worry about the color being off, or worry about sealing it.
IMG_2295

Shower and floor now grouted, everything is really coming together.IMG_2296

One thing was still missing from the bathroom, re-installing the toilet!
IMG_2299

One thing you do not see in the photo above is the hole I cut, once again using the hole drill described in the first section of this renovation.  I had to cut a hole for the toilet shut-off valve.  IMG_2301

When I installed the toilet, the water shut off valve started to leak.  I figured it was a good time to replace it (since it was also old and dirty).

IMG_3437

Much better!

Another finishing touch was installing the fancy new shower head.

IMG_3428

And now the after pictures!
IMG_3429

IMG_3438

Giving this bathroom a face lift was time consuming but completely worth it.  I learned it takes a lot of patience to install tiles, but quickly improved my technique, which should help me down the road.

-Mike

The Upstairs Bathroom Remodel – Part 1 of 2

This is a project we have wanted to do since the first day we moved into this house.  The upstairs guest bathroom had a cracked floor, moldy shower grout and an 80’s style that just couldn’t woo us.  Step one: Demolition!

IMG_2013

I tried to find a balance between my inner child wanting to swing a hammer, and my inner adult, warning me not to smash through two walls with one swing. (the living room wall is to the right)

Below are some of the materials we purchased.  Porcelain floor tiles, mortar, pre-mixed grout and concrete backer-board from Home Depot.  Ceramic subway tiles and 2×4 wall studs from Menards (because the prices were cheaper that week).

IMG_2016

Faux wood porcelain floor.

IMG_2015

When reading up about what we would need for this project, I saw that it would be helpful to have an extra drill, because mixing mortar by hand can be exhausting and totally unnecessary if you have a good electric drill.  I found this vintage Craftsman at a local thrift shop called Empty The Nest for $5.  It doesn’t go in reverse and smells a bit when you first use it, but it still has a lot of life left in it and was up to the task.

IMG_2019

“Rosie the riveter would be proud.”

With the supplies purchased, the demolition continues.  I now have all of the wall taken down around the shower.  I had an old blanket in the bottom of the tub to prevent scratches from falling tiles.  We decided from the beginning that the tub would stay. Its porcelain and super heavy, so moving it would have created more issues in renovating the bathroom than the space would warrant. Luckily, its white and easy to clean, which also gives it a Verlo seal of approval.

IMG_2022

“Don’t look at me, I’m not decent.”

Now begins the LONG process of removing the floor tiles.  I started by pulling up the threshold between the rooms, and chipping one tile away at a time.  The photo below shows how much progress I had made after about an hour of grueling work.

IMG_2080

On the area that has been cleared of tiles, note how there was only plywood beneath the tiles. This explains why many of the tiles were cracking. I have been reading how tile floors need at least 1/4″ concrete backer-board as a sub-surface. The wood will have to go!

After drilling a test hole, I determined that the floor beneath the tiles consists of a 1/2″ plywood layer, on top of a 3/4″ plywood layer.  Using a much quicker SMASH technique (read: hammer and a crowbar), I have started to remove the 1/2″ plywood layer and the tiles above it.  This wood layer will eventually be replaced by concrete backer-board.

IMG_2089

One other lesson I learned when tossing these tile scraps into the garbage. One broken piece sliced through the pair of leather work gloves I was wearing and nearly cut my finger. I stopped my work and bought a better pair of gloves designed for handling sharp edges.

With demolition complete, the next step is doing plumbing for the new bathtub fixtures.

IMG_2087

Before.

When doing this bathroom remodel, we took into consideration what we would need for our next bathroom remodel.  Behind the tub fixtures in this bathroom, is the master closet, which will eventually become part of an expanded master bathroom, specifically, where the tub will be located.  In the image below, I soldered copper pipes so that I have plumbing ready to go when we are ready to move forward with the next bathroom remodel.

IMG_2093

Hot and cold lines passing through the wall into the closet on the other side. More work now, but less down the road.  Also attached: the brass fixture for the new tub controls.

With the plumbing finished, I have started to screw the 1/2″ concrete backer-board into place around the shower.

IMG_2144

Guy at Home Depot recommended using coated screws sold right next to the concrete board. They do not rust and hold the board firmly to the wall.

There are a few different ways to cut the concrete board.  You can use a scribe tool on each side, then snap the board in two pieces.  Or, if you want to go the Tim The Tool-man Taylor route, you can buy a angle grinder with a diamond blade.

IMG_2196

The power tool method kicks up a bunch of dust, so they recommend wearing a mask and goggles. Also, avoid a bunch of cleanup by doing it outside.

More walls are getting covered.  This process requires a bunch of screws and a drill capable of high torque.  The battery on mine died a few times during this process, so I did this slowly over the course of a week.

IMG_2200

Between battery charges, I worked on some finishing touches to the plumbing.  Since this was my first attempt at plumbing a shower, I purchased the wrong elbow bend copper piece for the turn to the tub faucet.  So, I improvised, using a small piece of 2×4 and fastening the pipes on both sides.  This will keep the faucet from wiggling to the left and to the right.

IMG_2205

Okay, the concrete backer board is up.  Time to begin adding the subway tile!

IMG_2209

Step 1. Secure a level to the wall.

IMG_2210

Step 2. Tape the joints.

IMG_2211

Step 3. Apply mortar and start putting tiles on the wall.

IMG_2212

The amount I was able to finish the first night of work. I took my time and measured each layer before starting it. I also used 1/8″ spacers.

 

The tiling process was very slow.  I was working by myself and had just three hours each night during my workweek to dedicate to it.  It takes about 20 minutes to prepare the mortar, a couple of minutes per tile when you add up the time it takes to cut some of them, and about 20 minutes to clean up after the job each night.

IMG_2215

The first wall is nearly in place. And 2x4s are holding up the corner shelves.

The corner shelves were a bit tricky.  They are an odd weight, and held in place using just mortar.  I had to stick them to the wall, then wedge the piece of wood beneath them.  And over the course of a half an hour, I kept making small adjustments using a level, because they would move slightly over time.

Once I had the corner shelves taken care of, my next hurdle would be finding a way to make holes for the shower pipe and the tub pipe.

IMG_2243

I found a tool at Home Depot that is designed to cut holes in tiles.  It comes with a reservoir that you stick to the tile, and fill with water.  The reservoir helps guide the drill bit and keep it cool to cut the hole.

IMG_2244

Holes cut, the tiles fit right into place, and the ceramic subway tiles look great!

IMG_2245

Click here to see the finishing touches of this project.